Engineering & Construction

Technical Solutions for Projects, Machinery and Infrastructure

SID Re considers construction, erection and operational engineering risks requiring detailed technical assessment and carefully structured capacity.

Potential Risk Segments
  • Contractors’ All Risks
  • Erection All Risks
  • Civil engineering projects
  • Infrastructure development
  • Roads, bridges and tunnels
  • Airports and ports
  • Rail and metro projects
  • Power and utility projects
  • Water and wastewater facilities
  • Industrial construction
  • Mechanical and electrical installation
  • Machinery breakdown
  • Boiler and pressure vessel
  • Electronic equipment
  • Contractors’ plant and machinery
  • Civil Engineering Completed Risks
  • Deterioration of stock following machinery breakdown
  • Testing and commissioning
  • Project cargo linked to construction
  • Third-party liability associated with insured works
Potential Coverage Components
  • Contract works
  • Temporary works
  • Construction materials
  • Plant and machinery
  • Existing property
  • Testing and commissioning
  • Maintenance periods
  • Machinery breakdown
  • Business interruption
  • Advanced loss of profits or delay in start-up, where specifically agreed
  • Third-party liability
  • Debris removal
  • Professional fees
  • Expediting expenses

Risk review may incorporate design, contractor experience, project schedule, site conditions, natural hazards, testing procedures, values at risk and loss-prevention measures.